The Demand
This week you check whether your unit-level leader is running Unit 2 out of fear, out of ego, or without development — because the leader is the rung’s product, and if you build them wrong, Rung 5 collapses Unit 2 back into Unit 1.
The Work
- Review the last five decisions Unit 2’s leader made. If every one was checked against your preference first, name that as dependency, not alignment — the same trap as Rung 2’s first hire, scaled up.
- Compare Unit 2’s actual standards against Unit 1’s system. If the leader has drifted into running things their own way — not the system — name that as drift, not leadership, and correct it against the documented standard, not against your personal preference.
- Check whether the leader has received the same coaching cadence you received on your way up. If not, schedule it this week — a real development conversation, not a check-in.
- Identify whether the leader has hit their own Rung 3 or Rung 4 constraint inside Unit 2 — cover-shift problems, trust problems with their own leads — and confirm someone is developing them through it.
- Check your own calendar this week for shifts on the stage at any unit. If they exist, correct course: your verb is building unit-level leaders and the systems they run, not running units yourself.
This week, run one real development session with your unit-level leader and confirm your calendar shows leadership development work, not stage time.



